Miami and Port Everglades

For deliveries in the port of Miami and Port Everglades

Barge Tariffs

0001 - 0565 Metric Tons $9,940.00 Flat
0566 - 0628 Metric Tons $17.55 Per M.T.
0629 - 1025 Metric Tons $11,040.00 Flat
1026 -1632 Metric Tons $10.75 Per M.T.
1633 -2300 Metric Tons $17,590.00 Flat
2301 -2493 Metric Tons $7.65 Per M.T.
2494 - 3400 Metric Tons $19,080.00 Flat
Over 3400 Metric Tons $5.65 Per M.T.
Boom   $800.00
Allowed Laytime (Delivery) 150 MT/HR 4HR Minimum 18HR Maximum
Allowed Laytime (Loading) 375 MT/HR 4HR Minimum No Maximum
Demurrage (Tug) $450.00/HR
Demurrage (Barge) $450.00/HR

Note:
All Deliveries with A 2 Port Load or Discharge will include an Additional $2,500.00 Shifting Charge
TUG standby Charge $ 450.00/HR

Hydrant Tariffs

0001 - 0565 Metric Tons$6,250.00 Flat
0566 - 0628 Metric Tons $11.00 Per M.T.
0629 - 1025 Metric Tons $8.90 Per M.T.
1026 -1632 Metric Tons $8.25 Per M.T.
1633 -2300 Metric Tons $7.25 Per M.T.
2301 -2493 Metric Tons $6.30 Per M.T.
2494 - 3400 Metric Tons $5.40 Per M.T.
Over 3400 Metric Tons $5.00 Per M.T.

Effective January 1, 2016
Contracting entity for all bunker marine fuels supplied in the US shall be Glencore Ltd. with Glencore Ltd General Terms and Conditions to apply

Marketing

Tammi Herouart

+1 203 328 3163
+1 914 318 4750
FLMarineFuelmarketing@glencore-us.com

Janmarie Johnston

+1 954 848 7049
+1 954 812 9557
FLMarineFuelmarketing@glencore-us.com

Operations

+1 954 848 0047
ECMarineFuelOps@glencore-us.com

Address

Three Stamford Plaza
301 Tresser Boulevard
Stamford, CT 06901-3244